Capacitor fuse guide · Understand
How Capacitor Units Fail and What the Fuse Sees
A modern film capacitor element usually fails short: its foils weld together and the other elements in that series section take more voltage. Failures progress inside the unit until it is close to a short circuit, and then the external fuse operates. When it does, the healthy units in the same group see a higher voltage, and their stored energy discharges into the failed unit and its fuse.
Key points
- In film units an element failure welds the foils, shorting its section and raising stress on the remaining elements; the external fuse operates once the unit is essentially short circuited.
- The fuse sees two currents at once: higher power frequency current through the failed unit and a discharge from the healthy units in parallel.
- One manufacturer's guide puts parallel stored energy at 3.19 joules per kvar; nine 200 kvar units in parallel hold about 5.7 kJ.
- After a fuse opens, the units left in that group carry more voltage. For a grounded wye bank kOV = SP / (SP - F(S - 1)); ten units per group leaves about 11% overvoltage after one loss.
- Older paper and PCB units could gas and rupture; film units rarely bulge, so a blown fuse or a capacitance test is often the only sign.
Inside a capacitor unit
A capacitor unit is a sealed can holding many wound elements, connected in series sections with several elements in parallel in each section. Units are then connected in parallel groups to make up kvar and in series groups to make up voltage. The fuse question starts at the element.
Dielectric technology changed how elements fail. A widely cited protection paper explains that with older kraft paper or PCB dielectric, a failed element did not weld; the cellulose kept arcing, the paper charred, and gas built up inside the sealed can until, in many cases, it ruptured. Present-day units use as few as two or three layers of impregnated polypropylene film, and failures now cause the foils to weld together, forming a solid connection between the foils without arcing or charring.
How a failure progresses inside an externally fused unit
A relay maker's paper on capacitor bank fundamentals describes the sequence. An element failure welds the foils together and short circuits the other elements connected in parallel in the same section. The remaining series sections now share the unit voltage among fewer sections, so each sees more. If a second element fails, the process repeats, with an even higher voltage on what remains. Successive failures within the same unit eventually make the external fuse operate.
Each early step adds only a little current. A utility and relay maker paper notes that with all-film units the external fuse does not melt with the additional current drawn by the unit after a single element failure, so the unit stays in service until further series failures push the current high enough. The same paper series observes that element failures put the highest voltage stress on the rest of the failed unit, so the failure tends to progress inside that unit to a complete failure before it spreads to the rest of the bank.
Internally fused units behave differently. Each element has its own small fuse, and the failed element is disconnected, failing open, within a few cycles. Less capacitance is lost per failure, and the unit stays in service. That is why internally fused banks need more sensitive unbalance protection.
| Construction | How an element failure shows up | What removes it |
|---|---|---|
| Externally fused unit | Element fails short; voltage on remaining series sections rises; repeated failures approach a full short | The external unit fuse, once unit current is high enough |
| Internally fused unit | Element fails open after its internal fuse operates; small capacitance loss | The element fuse inside the can; relays track accumulated losses |
| Fuseless or unfused string | Element fails short and stays shorted; series elements share the voltage | Nothing locally; unbalance relays trip the bank at a set limit |
What the fuse sees when a unit fails
The protection paper identifies two components of the current through the failed unit's fuse: a higher power frequency current, because the shorted unit has lower reactance, and a transient current from the discharge from the healthy parallel elements or units. Both components must be considered when selecting a fuse: the fuses on the healthy units must not blow while they discharge into the faulted one, but the fuse on the failed unit must remove it quickly.
The discharge carries real energy. One manufacturer's capacitor fuse guide calculates it with the parallel capacitance charged to 1.1 times the crest of rated voltage, giving 3.19 joules per kvar. The arithmetic behind that figure: E = 0.5 C V^2 with V = 1.1 x sqrt2 x rated voltage and C = kvar / (2 pi f V^2) works out to 1.21 x 1000 / (2 pi f) = 3.21 J per kvar at 60 Hz, the same within rounding.
Worked example from that guide: a bank with ten 200 kvar, 13,280 V units per group. When one fails, the other nine discharge into it: 3.19 x 9 x 200 = 5,742 J. For scale, a single 50 kvar, 7,200 V unit (2.56 uF) charged to its 10,182 V crest holds 0.5 x 2.56 x 10^-6 x 10,182^2 = 133 J. How that energy is shared depends on the fuse: the same guide says an expulsion fuse conducts to a natural current zero so most of the energy is absorbed in the failed capacitor, while a current-limiting fuse with back voltage absorbs a large portion of it.
Voltage on the healthy units after a fuse operates
When a unit fuse opens, the parallel group it belonged to has less capacitance, so it takes a larger share of the string voltage. A relay maker's published unbalance paper gives exact formulas using P = units in parallel per group, S = series groups per string, R = strings in parallel per phase, F = failed units, and kOV = voltage on the most stressed healthy unit divided by its normal voltage. For a grounded single wye, fused bank: kOV = SP / (SP - F(S - 1)).
Worked example with that formula, S = 4 series groups and P = 10 units per group: one failed unit gives 40 / (40 - 3) = 1.081; two give 40 / 34 = 1.176; three give 40 / 31 = 1.290. As S grows, the expression approaches P / (P - F), so with ten units in parallel one open fuse gives 10 / 9 = 1.111. That is the origin of the published design rule to choose at least ten units in parallel so that one open fuse does not leave more than 10% overvoltage on the remaining units.
The same paper works an ungrounded single wye example: 138 kV, externally fused, four series groups of fourteen 21.6 kV units. Normal unit voltage is 138 / (1.732 x 4) = 19.92 kV, so the permissible factor is 1.1 x 21.6 / 19.92 = 1.192. One failed unit gives 1.063, two give 1.135 and three give 1.217, so the bank can tolerate two failed units in the same group of fourteen, but not three. System overvoltage stacks on top: two failures plus 10% system overvoltage gives 1 + 1.1 x (1.135 - 1) = 1.149.
| Failed units in one group (F) | Grounded wye, S = 4, P = 10 | Ungrounded wye, 138 kV example (S = 4, P = 14) |
|---|---|---|
| 0 | 1.000 | 1.000 |
| 1 | 1.081 | 1.063 |
| 2 | 1.176 | 1.135 |
| 3 | 1.290 | 1.217 (over the 1.192 limit) |
Why the 110% line matters, and how failures cascade
IEEE's 2005 interpretation of IEEE 18-2002 says the 110% maximum continuous overvoltage capability is provided so the bank can stay in service after the failure of at least one unit or element, and that it was intended for contingencies, not as a design basis. An informal subcommittee survey reported in the same document found users typically alarm at 105% of rated voltage and trip on unbalance above 110%.
The relay maker's paper explains why the limit is enforced: a failure causes an internal overvoltage inside the bank, which may cause more failures, which create even higher overvoltage, and eventually a cascading failure. It also notes that after a unit fails open in a group, the next unit failure is most likely to be in the same group, because those units are now the most stressed. A university dissertation on unbalance protection adds that capacitor units most often fail from continuous overvoltage stress, and that fusing is the first line of protection against unit failure.
Fuseless strings spread the stress differently. With E elements in series, losing one raises the voltage on the others by about E / (E - 1): published examples give 48 / 47, about 2%, and 100 / 99, about 1%. A published 230 kV fuseless bank table shows 1.41% overvoltage with one failed element, 4.35% with three and 9.09% with six, with alarm at three and trip at six.
Other ways a bank faults
Unit failures are not the only events the fuses and relays must cover. Published protection papers list these as well:
- Arc-over within the capacitor rack, and rack-to-rack flashovers between series groups where connections are not insulated.
- Bushing failures or faulty connections at a capacitor unit.
- Lightning: the RUS bulletin notes a surge charges the capacitor to the surge voltage by passing enormous charging current, which can cause the unit to fail from internal heat.
- Animals and contamination: one large utility's field experience, published with a relay maker, is that arcing and case ruptures are no longer the main causes of bank trips; most are caused by animals climbing on the bank, contamination or human error.
- Discharge current from parallel units into an external fault, and inrush when the bank or a neighboring bank is switched.
Case rupture: what fusing has to prevent
If a failed unit carries fault current long enough, internal arcing builds gas pressure until the case bursts. Capacitor makers publish tank rupture curves for that limit. One maker's curves for standard and heavy duty units carry a minimum of 2,000,000 A2s for fault currents of 10,000 A or less; its extreme duty curve 5,600,000 A2s up to 15,000 A; a second maker states 3,500,000 A2s minimum for 100 kvar and larger units below 10,000 A. To put 2,000,000 A2s in time: at 10 kA it is 2 x 10^6 / 10,000^2 = 0.020 s, about 1.2 cycles at 60 Hz.
The curves label a safe zone, usually no greater damage than slight swelling of the case, and an unsafe zone where the case may rupture. A fuse coordinates when its maximum clearing curve falls to the left of, or below, the rupture curve at and below the available fault current. One unit maker's instruction sheet is candid that fusing reduces the risk but does not remove it: explosive case rupture is possible in any application, even with proper fusing. It adds that partial fusing on delta or ungrounded wye systems, such as a two-bushing unit fused on one terminal, can let an internal fault from the unfused side to the case rupture the unit.
The case rupture article covers reading these curves against a fuse.
How to recognize a failed unit
Modern all-film units usually do not bulge from internal gassing when they fail, so visual signs are weaker than they were. In an externally fused bank the spring-loaded fuse or its indicator shows which unit dropped out. The RUS bulletin says slight bulging or blooming of a tank is not necessarily a failure; failure is usually shown by a severely bulging or ruptured case, or a blown fuse.
The reverse is also true. A utility and relay maker paper warns that intact fuses do not mean the units are healthy, and a blown fuse does not necessarily mean the unit failed; finding partially failed units needs a capacitance measurement of all units. The RUS bulletin says a unit whose measured capacitance varies significantly from the rated value should be retired.
Common mistakes
- Assuming a unit with an intact fuse is healthy. Element failures can accumulate below the fuse's operating current.
- Sizing a unit fuse for the failed-unit current only. Healthy units' fuses also carry the discharge into the failed unit and must not operate.
- Ignoring parallel energy. Every added unit in a group adds stored energy that the failed unit and its fuse must absorb or hold off.
- Leaving a bank in service after a blown fuse without checking the overvoltage on the remaining units in that group.
- Treating a slightly swollen case as proof of failure, or a flat case as proof of health. Measure capacitance.
Frequently asked questions
Do capacitors fail open or short?
Film elements in externally fused and fuseless units usually fail short, with the foils welded together. In internally fused units the element's own fuse then opens, so the element ends up failed open. The external fuse operates once enough elements have shorted that the unit is close to a short circuit.
What happens to the other capacitors when one unit fuse blows?
The remaining units in that parallel group take a larger share of the string voltage. In a grounded wye bank with four series groups of ten units, one loss raises their voltage to about 1.08 per unit and two losses to about 1.18, by kOV = SP / (SP - F(S - 1)).
Why does a capacitor case rupture?
Internal arcing generates gas, and if fault current continues long enough the pressure bursts the case. Older paper and PCB units were more prone to it. Makers publish tank rupture curves; the fuse must clear inside the safe zone at the available fault current.
How much energy discharges into a failed capacitor?
One manufacturer's guide uses 3.19 joules per kvar of healthy parallel capacitance, charged to 1.1 times crest of rated voltage. Nine healthy 200 kvar units give 3.19 x 9 x 200 = 5,742 J. Larger groups increase that energy.
Can a capacitor unit be bad if its fuse has not blown?
Yes. With all-film units, one shorted element does not draw enough extra current to melt the external fuse. Partial failures show up as a change in capacitance, so periodic capacitance measurement is the reliable check.
What overvoltage can healthy capacitor units tolerate?
IEEE 18-2002, as stated in IEEE's 2005 interpretation, allows continuous contingency operation up to 110% of rated rms voltage. Common practice reported there is to alarm at 105% and trip above 110%.
Why do failures tend to repeat in the same group?
After a unit drops out, the survivors in that group run at a higher voltage than any other units in the bank, so they are the most stressed. A relay maker's paper notes the next failure is most likely there, which can lead to a cascade if the bank is not tripped.
Next step
Capacitor Fuse Interrupting Rating and Parallel Stored Energy
Limits of this article
- This article explains general principles. Worked examples show the arithmetic only; confirm fuse and protection choices with the capacitor maker's data and a protection study.
- Capacitors hold a charge after disconnection, and a failed unit may be under internal pressure. Discharge, short circuit and ground them as 29 CFR 1910.269(w)(1) requires, and follow NFPA 70E, Standard for Electrical Safety in the Workplace, before handling.
- Tank rupture values quoted are individual manufacturers' published curves for their own units, not general limits. Use the curve for the actual unit.
Related
- Capacitor Case Rupture and How Fusing Prevents It
- Externally Fused vs Internally Fused vs Fuseless Capacitor Banks
- Capacitor Bank Unbalance Protection and How It Works with Fuses
- Capacitor Fuse Interrupting Rating and Parallel Stored Energy
- DNX and DNXC current-limiting capacitor fuses
- What Is a Capacitor Fuse?
- What Does C-Rated Mean on a Fuse?
- Current-Limiting vs Expulsion Capacitor Fuses
- All capacitor fuse guides
Sources
- Samineni, Labuschagne, Pope, Principles of Shunt Capacitor Bank Application and Protection (SEL)
- Kasztenny, Samineni, Capacitor Bank Unbalance Protection Calculations and Sensitivity Analysis (SEL, 2022/2023)
- Brunello, Kasztenny, Wester, Shunt Capacitor Bank Fundamentals and Protection (GE Multilin, 2003)
- Dhillon, Tziouvaras, Protection of Fuseless Capacitor Banks Using Digital Relays (PG&E / SEL, 1999)
- Moxley, Pope, Allen, Capacitor Bank Protection for Simple and Complex Configurations (SEL, 2012)
- S. Samineni, Capacitor Bank Unbalance Protection Enhancements, PhD dissertation, University of Idaho (2021)
- IEEE Standards Interpretations for IEEE Std 18-2002 (May 2005)
- ABB, Capacitor fuses, Technical selection guide 1VAG38852-TG Rev A (2024)
- Eaton R230-91-1, tank rupture TCC for MV standard and heavy duty single-phase capacitors
- Hubbell BR_10_204_E, Trinetics shunt capacitors (2024)
- GE GEH-2743B, AC Power Capacitors instructions
- USDA Rural Utilities Service Bulletin 1724D-112, The Application of Capacitors on Rural Electric Systems
- 29 CFR 1910.269(w)(1), capacitors