Fusing Pole-Mounted Capacitor Banks

Pole-mounted capacitor banks are normally fused by phase, one fuse per phase in a cutout, not one per unit. The link must carry about 125% to 140% of capacitor current continuously and ride through inrush, outrush and lightning, yet its maximum clearing curve must stay below the capacitor's tank rupture curve at the available fault current. Where fault current is too high for that, current-limiting fuses are one option.

Key points

  • The USDA RUS bulletin says pole bank units are not normally fused individually but by phase, and that group fusing should be rated about 135% to 140% of capacitor line current.
  • One capacitor maker's group fusing note: continuous capability at least 135% of rated current for grounded wye, 125% for ungrounded wye; tin K and T links carry 150% of rating, silver 100%.
  • Worked check: a 600 kvar, 12.47 kV grounded wye bank draws 27.8 A per phase; RUS lists a 25T link, whose 150% tin capability is 37.5 A, exactly 135% of 27.8 A.
  • The same maker's largest links that coordinate with its standard duty tank rupture curves are 100K and 65T, and only up to 10,000 A at X/R 0, falling to 6,500 A at X/R 15.
  • Ungrounded wye limits fault current to about three times line current, but after one unit shorts the others see line-to-line voltage.

How pole banks are built and fused

Pole banks are small, standardized and numerous. One public utility's material standard calls for pre-assembled banks of 300, 450, 600, 900, 1,200 and 1,350 kvar on a 12,470 V four-wire grounded-wye system, with 7.2 kV, 95 kV BIL, all-film units. One capacitor maker's racks hold 3, 6, 9 or 12 single-phase units for systems from 2,400 V to 34,500 V. The RUS bulletin's fusing table covers banks of 150 to 900 kvar at 12,470/7,200 V and 300 to 900 kvar at 24,900/14,400 V.

The RUS bulletin states the fusing practice plainly: capacitor units are not normally fused individually, but by phase, in a bank of one or more capacitors per phase. The fuse is usually an expulsion link in a cutout, which also serves as the bank's switching and isolating point. Note that IEEE C37.99, the bank protection guide, excludes pole-mounted banks on distribution circuits from its scope, so practice here comes from utility standards and manufacturer guidance.

Continuous rating rules for group fuses

Published rules differ in wording but share a target: the link must carry the bank's worst steady current without aging.

  • RUS: protection should have a nominal rating of 135% to 140% of the capacitor line current; fusing is normally designed to operate at 120% to 135% of nameplate current, occasionally derated to no less than 108% for multiple units per phase.
  • RUS: a link should melt in 5 minutes at 150% to 300% of its rated current; minimum 5 A; in high-lightning areas 15 A or larger, but no greater than 140% of the capacitor's nameplate current. The bulletin adds that the choice should always be based on the particular fuse's time-current characteristics.
  • One capacitor maker: continuous capability of at least 135% of rated current for grounded wye banks and 125% for ungrounded wye, because group fuses must withstand normal current including harmonics, inrush and outrush. A municipal utility's protection standard uses the same 135% and 125%.
  • Link capability: the same maker says tin T and K links carry 150% of their rating continuously, while silver links carry 100%.
  • RUS: sizing must allow for the 135% capability, overvoltage, harmonics and actual kvar on the high side of manufacturing tolerance.

Worked example: checking the RUS T-link table

Per-phase current for a grounded wye bank is (bank kvar / 3) / kV line to neutral. For a 600 kvar bank at 12,470/7,200 V: 200 / 7.2 = 27.8 A. The 135% target is 1.35 x 27.8 = 37.5 A. RUS Table 3 lists a 25T link. A tin 25T carries 1.5 x 25 = 37.5 A continuously, which meets the target exactly.

The table below repeats the RUS 12,470/7,200 V rows and adds the same check for each. Every listed link carries at least 135% of capacitor current continuously when it is a tin link; a silver link of the same number would carry only its rating, so the metal matters as much as the size. The RUS 24,900/14,400 V rows follow the same pattern: 300 kvar at 6.9 A uses an 8T, 450 kvar at 10.4 A a 10T, 600 kvar at 13.9 A a 15T, and 900 kvar at 20.8 A a 20T.

Currents and links from RUS Bulletin 1724D-112 Table 3; the last three columns are worked arithmetic using the 150% tin-link capability
Bank (12,470/7,200 V grounded wye)Current per phase135% targetRUS linkTin link continuous (x 1.5)Link continuous / current
150 kvar6.9 A9.4 A8T12 A1.74
300 kvar13.9 A18.8 A15T22.5 A1.62
450 kvar20.8 A28.1 A20T30 A1.44
600 kvar27.8 A37.5 A25T37.5 A1.35
900 kvar41.7 A56.3 A40T60 A1.44

Grounded wye or ungrounded wye

The connection changes both the fault current and the voltage the healthy units see. One capacitor maker's group fusing note says operating a pole bank ungrounded wye limits fault current to about three times line current. The catch is voltage: after one unit shorts, the healthy units in the other phases see line-to-line voltage, 1.73 times their rating. That pushes for a fast-clearing link such as a K, while the transient-current criterion dictates a slow-clearing link such as a T. On a grounded wye bank, the fault current through a shorted unit is limited only by the system, which is what brings the tank rupture curve into play.

Utilities pick one or the other by system. A municipal utility's standards connect banks on its 7.2 kV ungrounded delta system ungrounded wye, and banks on its 14.4 kV solidly grounded wye system grounded wye. The RUS bulletin cautions that floating a wye point to block harmonic ground current is a last resort, because ungrounded cases can become energized to primary voltage, and that with delta or ungrounded wye banks, line voltage can feed back through the capacitor's common connection to an open phase. A relay maker's paper adds a grounded wye drawback: circulating inrush and harmonic currents may cause misoperation of relays and fuses.

The tank rupture limit on link size

Capacitor makers publish tank rupture curves, and one maker's coordination rule is that the fuse maximum clear curve must fall below the tank rupture curve at and below the available fault current, with the rupture curve compensated for asymmetry at high fault currents. Its curves for standard and heavy duty units carry a minimum of 2,000,000 A2s for fault currents of 10,000 A or less, and note a minimum clearing time of 0.8 cycle for safe coordination with expulsion fuses. For scale: 2,000,000 A2s at 10,000 A is 0.020 s, about 1.2 cycles at 60 Hz, and 0.8 cycle is 13.3 ms.

That maker lists the largest links that coordinate with its units and the fault current limits that go with them. A municipal utility's protection standard states the consequence directly: fusing greater than 100K is not allowed due to the capacitor tank rupture curve. Above those fault levels, the maker lists three options: current-limiting fuses, ungrounded wye operation, or moving the rack to a location with less fault current.

One capacitor maker's maximum available fault current (rms symmetrical) for which its largest expulsion links coordinate with its tank rupture curves
Unit duty classX/R 0X/R 5X/R 10X/R 15
Standard and heavy duty (100K or 65T max)10,000 A7,800 A6,900 A6,500 A
Extreme duty (100K or 65T max)15,000 A11,700 A10,350 A9,750 A

Current-limiting and combination fuses on pole banks

Where available fault current exceeds what an expulsion link can coordinate with, the capacitor maker's note lists current-limiting fuses as one remedy. Some utilities have moved that way as standard. One public utility's 600 kvar bank, built from three 200 kvar, 7.2 kV units, uses polymer cutouts rated 100 A, 16 kA asymmetrical, with an 8.3 kV, 30 A combination expulsion and current-limiting fuse that fits a universal cutout; the utility changed to that fuse from separate expulsion and current-limiting fuses in 2015. Checking it with the arithmetic above: 27.8 A x 1.35 = 37.5 A, and the fuse's continuous capability has to be confirmed against that from its maker's data, since the 150% tin-link rule does not apply to current-limiting elements.

DENCO's C-rated capacitor fuses are current-limiting, and DENCO's catalog lists them for indoor use, or outdoor use within an enclosure. The DNX series covers 2.8 kV to 38 kV with a 50 kA asymmetrical interrupting rating; the DNXC series covers 8.3 kV to 23 kV, 10 A to 65 A, 50 kA, for bus bar to lead mounting. For pole-top equipment, send DENCO the bank kvar, unit voltage, available fault current and mounting, and DENCO engineering will confirm what fits.

Transients: inrush, outrush and lightning

Pole banks are usually far from other banks, and the capacitor maker's note observes that back-to-back switching is seldom the case for pole-mounted capacitors. Isolated bank energization still drives inrush through the group fuse, and on grounded wye systems the bank discharges into nearby external faults. The maker lists capacitor bank switching, lightning surges and discharge through external faults as the transient sources group fuses must withstand, and warns that fuses can be damaged by high-magnitude, high-frequency currents.

Lightning gets its own rule in the RUS bulletin: if lightning causes excessive fuse blowing but there is no capacitor damage, replace the fuses with the next larger size, within the 140% of nameplate ceiling for high-lightning areas. Arrester selection supports the fuse. One maker's ordering guide pairs 7.65 kV MCOV arresters with 7,200 V line-to-ground systems and 15.3 kV MCOV with 14,400 V. A capacitor maker's instruction sheet says the arrester protective level for a 1.2 x 50 wave should be less than two-thirds of the capacitor BIL: for a 95 kV BIL unit, below 63.3 kV.

Switching, operation and safety at the pole

  • Load-break capability: the RUS bulletin notes a 600 kvar bank at 7,200 V draws about 28 A and cannot be unloaded without load-break cutouts.
  • Opening cutouts: a capacitor maker's instructions say cutouts used for switching should be opened as rapidly as possible to minimize arcing.
  • Phase balance: the RUS bulletin says to install equal kvar per phase and take the whole bank out when one phase is out.
  • Approach: one control maker advises looking for smoke, fire, open fuses, crackling or loud buzzing before approaching a pole bank control, and treating components as if at primary voltage if a fault is suspected.
  • Grounding: one public utility's standard warns that capacitors must be grounded after they are de-energized because they stay charged for a long time. OSHA 1910.269(w)(1) requires a wait of at least 5 minutes after disconnection, then short circuiting before work.

Common mistakes

  • Using a silver link where a tin link's 150% capability was assumed. The same number carries a third less continuously.
  • Going up in link size to stop nuisance blowing without checking the tank rupture limit at the site's fault current.
  • Relying on the largest expulsion link where fault current exceeds the limits in the capacitor maker's table. Use current-limiting fuses, ungrounded operation or a different location.
  • Sizing a group fuse for an ungrounded wye bank as if it were grounded, or ignoring the line-to-line stress on healthy units after a short.
  • Opening an energized bank of 28 A or more with a standard cutout instead of a load-break tool or cutout.
  • Leaving a bank on line with one phase fuse blown.

Frequently asked questions

What size fuse for a 600 kvar pole-mounted capacitor bank?

On a 12,470/7,200 V grounded wye system the bank draws 27.8 A per phase, and the RUS bulletin's table lists a 25T link, whose tin 150% capability is 37.5 A. Confirm against the capacitor maker's tank rupture curve and the fault current at the pole.

Are pole-mounted capacitors fused individually?

Usually not. The RUS bulletin says pole bank units are normally fused by phase, one fuse per phase covering one or more units. Individual unit fusing is typical of substation and metal-enclosed banks.

Should I use K or T links on a capacitor bank?

RUS Table 3 lists T links. One capacitor maker's note explains the tension: on ungrounded banks the overvoltage on healthy units after a short pushes toward a fast K link, while inrush and transient currents point toward a slow T link. Use the fuse's time-current curve, not the letter alone.

What is the largest fuse link I can use on a capacitor bank?

It is set by the capacitor's tank rupture curve and the available fault current. One maker's standard duty units coordinate with links up to 100K or 65T only up to 10,000 A at X/R 0, and 6,500 A at X/R 15. A municipal utility does not allow fusing larger than 100K.

Why do pole capacitor bank fuses blow during storms?

Lightning drives large charging currents into the capacitors. The RUS bulletin says that if lightning causes excessive fuse blowing with no capacitor damage, use the next larger size, staying within 140% of nameplate current in high-lightning areas.

Can current-limiting fuses be used on pole-mounted capacitor banks?

Yes. One capacitor maker lists current-limiting fuses as a remedy where fault current is too high for expulsion links, and one public utility uses a combination expulsion and current-limiting fuse in a universal cutout on its standard 600 kvar bank.

Grounded or ungrounded wye for a pole capacitor bank?

Ungrounded wye limits fault current to about three times line current but puts line-to-line voltage on healthy units after a short. Grounded wye exposes the bank to full system fault current but gives a harmonic and surge path. Utility system grounding usually decides.

Next step

Capacitor Fuse RFQ Checklist: What DENCO Needs to Quote

Request a capacitor fuse quote See DNX and DNXC fuses

Limits of this article

  • This article explains general principles and published utility practice. Worked examples show the arithmetic only; confirm fuse selection with the capacitor maker's data, its tank rupture curve and a protection study for the site's fault current.
  • Capacitors hold a charge after disconnection. Discharge, short circuit and ground them as 29 CFR 1910.269(w)(1) requires, and follow NFPA 70E, Standard for Electrical Safety in the Workplace, before handling.
  • Link capabilities and coordination limits quoted are from individual manufacturers' and utilities' documents for their own equipment.
  • DENCO ratings quoted here come from DENCO's catalog and are pending technical review. Confirm ratings with DENCO engineering before specifying.

Related

Sources

CallRequest a quote